Chemical Engineering Plant Capital Cost Estimator
Project Setup
|
|
|
|
Process Type: |
|
Installation factor: |
|
Current CE Plant Cost Index (CEPCI): |
Currency: |
|
USD/currency Exchange Rate: |
|
Plant Location: |
|
Location Factor |
|
Equipment List
|
Equipment Name |
Equipment Type |
Quantity |
Value |
Material |
Purchase Cost, material basis |
Installed Cost |
|
All costs given in
Total Cost Results
Description |
Value |
ISBL []: |
|
Offsites factor (OS): |
|
Design & Engineering factor (D&E): |
|
Contingency factor (X): |
|
Total Fixed Capital Cost []: |
|
References
Towler, G. and Sinnott, R.K. (2020). Chemical Engineering Design (Sixth Edition).